Janssen Pharma

Description

Pharmaceutical

Client

Janssen

Services

Fire Engineering, Building Services Engineering

Project Value
Location

Cork, Ireland

Date

02/01/2024

Summary

AFEC supported DPS Engineering in the Fire Safety and Access Engineering for a new single use Cell Culture Suite at Janssen Biologics site in Cork, Ireland.

The main project drivers were to provide experience in fed-batch processing and to provide internal supply chain capacity for fed-batch material. The facility was designed to provide pre-clinical, clinical and commercial capacity, for multiproduct capability on a campaign basis and to be fully MES enabled.

The facility included use of single use bioreactors (SUB’s) and single use mixers (SUM’s) from proprietary suppliers with integrated DCS control on board, up to 1000L. The facility included a pre-culture suite utilising wave bag technology, cell separation systems, protein capture and product isolation systems in an ISO8/7/5 clean room environment.

One of the major successes of this facility is that it went from design to batch in 12 months.

Some of the key benefits of the project are:

  • System set up time – reduction in resources
  • Batch turnaround time was reduced
  • Increased flexibility
  • Multi-product
  • Commissioning and qualification time reduced
  • Reduced capital investment
  • Ease of product changeover
  • Footprint reduction
  • Representative of scaled down model